  • Project typeDemolition
  • Project valueOver $10 million
  • Project scheduleApril 2024 to 2026
  • Contractor nameRitter & Paratore Contracting Inc.

SDC 2

The Former Syracuse Developmental Center campus redevelopment is a diverse development project that will feature multiple buildings accommodating a mix of uses, including apartments catering to various needs such as market-rate, workforce, and affordable housing. These will be situated on the northwestern part of the site. Simultaneously, a cutting-edge manufacturing facility and office space will be constructed on the southeastern portion of the property. 

The project will be divided into phases, commencing with the demolition of the existing site followed by subsequent redevelopment efforts. Ritter & Paratore Contracting Inc. have a contract with the City to manage the demolition of a large structure and some other buildings. Demolition is scheduled to start in May and finish by the end of the year, happening in stages. C&S Companies, with their subconsultant Artic Enterprises, Inc., will monitor air quality during demolition to ensure safety. After demolition, the site will be restored, with completion expected in early 2025.


Starting Point

Site History & Existing Conditions:

In 2019, the City of Syracuse took possession of the 48-acre plot at 800-02 S. Wilbur due to prolonged tax delinquency. During this period of neglect, the site fell into disuse and suffered vandalism. Given the substantial environmental remediation required, repurposing the existing structures economically is unfeasible. Demolition of the existing structures on the site begins in Spring 2024. With municipal oversight, a remarkable opportunity emerges to establish a hub for inclusive economic development, promising fresh employment opportunities and providing high-quality, accessible housing options.

 

 

 

What is Being Done?

Project Timeline

  


Location

800 S Wilbur Ave,  13204  View Map

Google Map Instructions

Press arrow keys to pan

Press plus or minus keys to zoom

Shortcut keys

Press M for roadmap view

Press S for satellite view

Press H for hybrid view

Press T for terrain view